Securing a difficult consent
The proposal required the demolition of the existing property and faced fierce local opposition. Establishing a robust planning case called for persistence, careful design development and a clear response to the sensitivity of the seafront setting. Consent unlocked the opportunity to replace an underperforming building with a home designed specifically for the site.






